Bayside Power Plant Pipeline Shoring
Location
Tampa, FL
Market
Industrial
Market Sub Sector
Services
Sheet Piling
Client
Mears Group
Owner
Tampa Electric Company
Description
Work trench for pipeline installation
Division
ASAP Installations
Challenge
Provide trench shoring 10’-15’ away from railroad tracks and perform installation and removal from a limited work platform.
Solution
Furnished, installed and removed temporary cantilever sheet pile walls. ASAP Sheetpiler small footprint made possible the installation from the existing embankment, work platform was 12’-15’ wide. Installation was performed with tracks not extended to capacity, which caused careful maneuvers to complete the project. We provided hot-rolled sheet piles with high moment of Inertia thus limiting deflection and soil settlement to protect railroad tracks