Palm & Hibiscus
Location
Miami, FL
Market
Water Management
Market Sub Sector
Services
Sheet Piling
Client
Lonzo Contruction
Description
Three Pump Stations
Division
ASAP Installations
Challenge
Provide shoring without bracing and limiting the vibration output due to the proximity of houses.
Solution
Designed, furnished, installed and removed three sheet piling coffercells. Excavation depths ranged from 20’ to 21’. Pump Station work was performed on the wet, which allowed the first two coffercells to be design with heavy sections as a cantilever. This feat reduced substantially the installation duration, thus creating cost savings for the project. The last coffercell required bracing due to portraying softer soil in that specific location. ASAP High Frequency Variable Moment Hammer allowed installation and removal to be performed at all times without exceeding the vibration output threshold.