
Park Grove Tower
Location
Miami, FL
Market
Buildings
Market Sub Sector
Services
Sheet Piling
Client
John Moriarty & Associates
Description
Foundation Temporary Sheet Pile Shoring
Division
ASAP Installations
Challenge
Foundation Temporary Sheet Pile ShoringProvide a cost-effective sheet piling solution that needed to be driven through hard material within close proximity of adjacent buildings (10 coffer cells and perimeter sheeting).
Solution
ASAP worked closely with the general contractor at Park Grove towers to develop a cost-effective shoring solution that followed the construction sequence. Material was re-used thus creating cost savings, installation and removal of sheet piles was tailored to the general contractor needs. All drivelines were pre-drilled prior to installation to minimize vibration and to allow sheet piles to reach minimum tip elevation. The cell closest to the adjacent building was braced for further support to the sheet piling. This also helped limit deflection to unnoticeable levels. The entire operation was completed successfully without any issues pertaining to vibrations and/or settlement to adjacent structures.