The Blue Lagoon
Location
Miami, FL
Market
Buildings
Market Sub Sector
Services
Client
Estate General Contractors
Description
330-unit luxury rental community.
Division
ASAP Installations
Challenge
Reclaim land, protect new structures from potential sea level rise and install retaining system out in the water.
Solution
Design, furnished and installed a permanent cantilever sheet pile seawall. Sheet piles were coated with Coal Tar Epoxy as per FDOT standards. The absence of tie-backs and/or anchors substantially increased the usable land behind the retaining wall thus adding value to the property as a whole. Installation performed from land without any difficulties thanks to the flexibility of the ASAP Sheetpiler, which managed to reach at some locations about 30’ out in the water.